OAK Refrigeration Limited
OAK Air Conditioning & Refrigeration Systems OAK Electrical Services OAK Air Conditioning & Refrigeration Systems

Case Studies

New Butchery area installed to cash and carry in plymouthCase Study Image
Oak Refrigeration have recently been appointed to install a new butchery area to a leading cash and carry group. The works comprised of a complete D&B by Oak which included power, lighting, refrigeration, foodsafe finishes and plumbing works.
[read case study]
Oak fitout Londis in Glenfield LeicesterCase Study Image
Oak have recently completed a fitout of a new Londis in Glenfield in leicester using leading edge technology to save energy and also to meet a noise restiction of 32 dba at 10m requested by the local council. Energy saving has been provided by using EC fans sets, plant optimisers and by floating suction pressures.
[read case study]
Complete Refit of Large Food FactoryCase Study Image
Oak Refigeration have recently completed the refit of a large food factory within the West Midlands. Part of the 12 month project involved installing some 20 evaporators, ring mains and a major overhaul to the controls and machinery room within one of the plantrooms.
[read case study]
Refit of 100,000 sq/ft Cash & Carry in LiverpoolCase Study Image
Oak Refrigeration have recently completed a refit of a 100,000 sq ft cash and carry in Liverpool. Due to the age and condition of the existing machinery and cases it was decided to carry out a total refit which included the replacement of refrigeration machinery, packs, alarm system and coldroom evaporators.
[read case study]
TJ Fast Foods New Freezer ColdroomCase Study Image
Oak Refrigeration have recently installed a large holding freezer comprising of 22m x 15m x 5m high. The Freezer will allow TJ Fast Foods to provide a larger range of frozen foods to their customers with the new additional freezer.
[read case study]
Oak Refit Cost CutterCase Study Image
Oak Refrigeration recently were awarded the complete refrigeration refit at Cost Cutter Sileby Leicester comprising of removal of existing machinery complete with the safe disposal of the refrigerants and cases. The works were phased over several weeks working with the shop fitters to ensure disruption was minimised to the sales floor.
[read case study]
The French Connection ColdroomCase Study Image
Oak Refrigeration have recently completed the installation of a chiller coldroom for French Connection Ltd who specialise in bringing to the UK fresh food products from France.
[read case study]
The Flower CompanyCase Study Image
Due to the rapid expansion of the Flower Company in recent months it has been necessary for Richard Turner Managing Director to relocate his company into new larger premises in Leicester.
[read case study]
House air conditioning moves to VRV LevelsCase Study Image
Oak Refrigeration have secured the order to supply, install and commission a 20 fan coil order for a new large manor house being built in Wolverhampton. The system will utilise the latest R410 VRV inverter controlled system from Mitsubishi which will provide the end user with flexibility and energy saving facilities.
[read case study]
Londis WigstonCase Study Image
Oak Refrigeration have recently completed a refit of Londis Wigston Leicester. It was identified by the owner of the site that they were loosing potential sales for chilled wines and beers. With the Festive season fast arriving Oak were requested to provide a fast turn key solution to their problem. Oak were recommended to the owners by another Londis member who had recently utilised the companies refrigeration skills for a similar project.
[read case study]
Retail Refrigeration RefitCase Study Image
Following the completion of a 16 week refit of a leading retailer in the midlands Oak have recently completed the installation of 2 packs, coldrooms and cases. The refrigeration systems designed by Oak included water misting systems to reduce the condensing pressures in the summer and also the installation of EVI scroll compressors. Using EVI scroll compressors reduced the input power to the freezer plant by 30% V standard scroll compressors. Oak also installed pulse heaters to the glass doors to reduce the trim heater loads/energy usage by 40%. Pack floating system was also introduced to the HT pack to trim the demand to provide further savings in energy usage.
[read case study]
Contact Us Location News Case Studies
Case studies
To view some examples of Oak's lastest projects.
Click to view..
Latest News
The OAK refrigeration website is launched, providing a portal to both OAK's products and services an.....
Click to read..  
Site Design: Caboodal